Town of Weston, Connecticut
Home MenuRFPs / RFQs / ITBs
Click on the Title below for more information regarding
Requests for Proposals, Requests for Qualifications, and Invitations to Bid
Documents should be delivered to the Town Clerk (unless otherwise specified):
Weston Town Hall
56 Norfield Road, PO Box 1007
Weston, CT 06883
Hours of operation: Monday through Friday, 9:00 am to 4:30 pm
Previous RFP / RFQ / ITB
- TREE CLEARING SERVICES - Click here for updated information as of 01-18-2024
- RFQ - Engineering and Administrative Services
- REPLACEMENT OF BRIDGE #07001 MICHAEL'S WAY OVER WEST BRANCH SAUGATUCK RIVER - Legal Notice - Addendum (October 25, 2023) - Addendum (October 31, 2023) - Addendum (November 8, 2023) - Addendum (November 10, 2023)
- ENGINEERING SERVICES IN SUPPORT OF DRINKING WATER SYSTEM IMPROVEMENTS - Request for Qualifications - Request for Qualifications Supplemental Information
- WESTON TOWN HALL BASEMENT ALTERATIONS - Basement Alterations - Invitation to Bid - Basement Alterations - CHRO Compliance Documentation - Basement Alterations Addendum #1: July 26, 2023 - Basement Alterations Addendum #2: July 27, 2023
- TOWN OF WESTON BOOSTER TREATMENT STATION IMPROVEMENTS - Request for Qualifications - Supplemental Information
- LOCKER ROOM RENOVATIONS TO THE WESTON PUBLIC SAFETY FACILITY - Invitation to Bid: Police Locker Room Renovations - Addendum 1: CHRO
- REHABILITATION OF BRIDGE #04690 RIVER ROAD OVER SAUGATUCK RIVER AND PRESERVATION OF BRIDGE #04351 DAVIS HILL ROAD OVER SAUGATUCK RIVER - Legal Notice
- REPLACEMENT OF BRIDGE #07001 MICHAEL'S WAY OVER WEST SAUGATUCK RIVER - Request for Qualifications: Bridge:#07001 Michaels Way over West Saugatuck River - Plans for Replacement of Bridge 07001 Michael's Way over West Branch Saugatuck River - Specifications or Replacement of Bridge 07001 Michael's Way over West Branch Saugatuck River - Plans Subset 3 - Highway - Plans Subset 4 - Structures
- PAVING IMPROVEMENTS SUMMER 2023 - Click here to see the Paving Improvements Invitation to Bid - Paving Addendum #1 - CHRO Compliance
- COMMUNITY CONNECTIVITY PROJECT-Contract Documents Part 1 of 2Contract Documents Part 2 of 2 href="https://www.westonct.gov/home/showpublisheddocument/9807/638149889636270000" target="_blank" tabindex="-1" style="font-size: 16px;">Addendum (1) Part 1 of 1Addendum (2) Part 1 of 2 - Addendum (2) Part 2 of 2 - Addendum (3) Part 1 of 1
- Superstructure Replacement with Substructure Modifications and Repairs for Bridge No. 04960, River Road over Saugatuck River; and Preservation of Bridge No. 04351, Davis Hill Road over Saugatuck River - Legal Notice
- Town Green Improvements - Town Green Construction Drawings - Town Green Addendum #1 (03-08-2023)
- 2023 WESTON RFP REVAL
- Paving improvements Summer 2022
- Legal Notice for Weston Town Center Improvements - Phase 2
- Sill Repairs for the Weston Intermediate School - Project Manual Drawings
- Land Mobile Radio Consultant: (REVISED 7-16-2021) LMR Consultant RFP with Track Changes - REVISED 7-16-2021) LMR Consultant RFPLMR RFP Addendum #1 (July 26, 2021)
- RFP Body Camera - HTML
- Facilities Optimization Committee Project
- Library Roofing Project: Project Manual - Library Roof Drawings